Full prestation
One industrial partner.
One controlled flow.
Material, machining, fitting, managed special processes, assembly, inspection, documentation and logistics — under a single point of responsibility.
The chain we take over
From raw material to a delivered, documented component
What changes for you
Fewer interfaces. One accountable supplier.
Splitting a part across a machinist, a treater and a logistics provider means three qualifications to maintain, three sets of lead times to reconcile and three parties to arbitrate between when something goes wrong.
Single point of responsibility
One supplier owns the route end to end. There is no interface at which accountability is handed off.
Reduced supply-chain complexity
One purchase order, one delivery, one invoice, one supplier qualification to maintain.
Controlled lead time
External process time is planned inside our schedule, not discovered after machining is finished.
Consolidated quality data
One documentation package covering material, machining, external processes and final inspection.
The honest version
What "one-stop-shop" does not mean here
It does not mean everything happens under our roof. Machining, cutting, fitting, inspection and assembly are performed at ESM. Surface treatment, coating, heat treatment and non-destructive testing are performed by qualified partners.
What ESM takes on is the industrial responsibility for the whole route: selecting and auditing the partner, flowing down your requirements contractually, planning the external time into the schedule, re-inspecting the part on return and issuing a single consolidated release.
Package transfer
Taking over an existing package
Package review
Part list, volumes, definitions, current routes and the existing quality history — reviewed before any commitment.
Capacity allocation
Machine-by-machine load simulation against our rolling capacity plan, so the ramp-up is arithmetic rather than intent.
Industrialisation and FAI
Process definition, fixturing, programming, simulation and First Article Inspection per part number.
Series release
Standards frozen, operators authorised, control plan issued, delivery performance monitored from the first shipment.
Next step
Discuss your next package
Bring us a part family rather than a single part number. That is where a single controlled flow actually pays.